Opens in a new tab

UPS Gateway Center

General contracting works of the United Parcel Service (UPS) Istanbul (IST) Airport Gateway Building are successfully carried out by POLARKON within as much as six months in total time.

The building is built on a plot of approximately 15.000 m², with a total area of 3.250 m² of management and operation section, where 6.500 m² of total construction area has been completed.

The management section consists of reinforced concrete carcass and space frame structures, that is based on a reinforced concrete carrier system.

Client
Type
City
Country
Total
Year
UPS
Istanbul
6.500 m²
2018